Login

Your Name:(required)

Your Password:(required)

Join Us

Your Name:(required)

Your Email:(required)

Your Message :

Why BIPV(Waterproof) Solution Profits better than BAPV

Author: becky

Jun. 17, 2024

105 0 0

Why BIPV(Waterproof) Solution Profits better than BAPV

  1. Installed Capacity: normally 10K Sqm could install 1.0-1.2MW in BAPV solution, but BIPV Solution could installed around 1.5MW, 20% higher than BAPV solution. Means Generation raise more than 20% in same roof.
  2. Bearing Capacity: the Strcuture Consulant might worry about whole rooftop strcuture, but actually total aluminum BIPV mounting Bearing capacity is lees than 0.2KN/sqm, but BAPV is around 0.3KN/M2, it actually better for factory steel structure, beams and poles.
  3. Lifetime CAPEX Forecast : Although indeed BIPV solar mounting price is more expensive than normal BAPV solar mounting solution, but when consider Metal sheet Tin roof, metal sheet roof normally need to replace every twn years, because metal sheet design life is 10 years, but all solar module and solar projects design life more than 25-30 years. so CAPEX BIPV is cheaper than Two times metal sheet Cost + BAPV Cost.total lower than 20%
  4. 100% recycle: the whole mounting solution and solar module, could 100% recycle because Antaisolar Taiyang Roof have better anti- corrossion, after design life 25 years later could be sell again as material.
  5. Installation and O&M Cost: Because the whole material reduce a lot, and installation process increase a lot, O&M because all connector, MC4 hidden under solar module, so O&M much easier than BAPV.so manual work cost after calculation, 15% cheaper than steel BIPV, 40% cheaper than BAPV.

Are you interested in learning more about bipv vs bapv? Contact us today to secure an expert consultation!

Status of BIPV and BAPV System for Less Energy-Hungry ...

The Ministry of Power, which controls the power sector in India, created an impressive mission through Jawaharlal Nehru National Solar Mission (JNNSM). Previously, JNNSM has set a target to install a PV capacity of 22 GW by the year which later increased to a more ambitious target of 100 GW [ 11 ]. Subsequently, to reduce building energy consumption and generate power from renewable sources in the buildings; zero energy buildings (ZEB) or net-zero energy buildings are also getting a promotion. Hence, addition of the PV system into the building is one of the most holistic approaches, where, PV will generate a benevolent amount of energy, sufficient for the building-energy requirements. The inclusion of PV technologies into buildings include building-integrated photovoltaics (BIPV) and building-applied photovoltaics (BAPV). For the BIPV system, the PV system replaces the traditional building envelopes, such as windows, roofs, walls and itself acts as a building envelope, whereas for the BAPV system, PVs are applied or attached to the building walls or roofs. Both BAPV and BIPV works as an onsite green power generation, reducing the transmission losses, and improving the building&#;s overall performance.

The present energy consumption scenario, along with future projections, has forced India to take some necessary actions. In , the international energy association (IEA) has set a target to limit the ambient temperature increment to below 2 °C than the pre-industrial levels. Hence, India should focus on finding out the energy-efficient ways to generate power and also reduce building energy consumption rates. Fortunately, India is blessed with high solar radiation, which receives 6 billion GWh equivalent energy potential per year. The average incident solar radiation in India is 5.1 kWh/m/day (with large regional differences). This makes India deploy solar photovoltaic (PV) technology to meet the IEA target. The PV device is one of the most promising renewable energy technologies, which converts solar energy into environment-friendly electrical energy by using abundant incident solar radiation. Replacing fossil fuel-generated power by secure, clean and suitable PV generated power can mitigate issues like climatic changes [ 9 10 ].

Currently, India is facing urbanization due to the migration of people into larger cities from smaller towns and villages. This transition enhances the necessity of developing new buildings. During -, India consumed almost 840 million mfloor space for commercial use. Buildings in India, consume 29% of the total energy, of which residential contributes to 20% and commercial to 9% [ 6 ]. In residential buildings, lighting and space cooling accounts to one-third of the energy consumption (1&#;3 kWh/m/month), whereas commercial buildings consume two-third of the total energy (5&#;25 kWh/m/month) [ 7 ]. The phenomenal growth in the building sector will be witnessed by the year with an annual building rate of 700&#;900 million sq. m. These buildings consume a considerable amount of energy for heating, ventilation and air conditioning (HVAC) load demand. Further, the indoor air condition rate is growing at a rate of 30% every year. Projected energy usage for , with the current scenario, shows an 85% increment compared to the energy level in [ 8 ].

India&#;s energy consumption has increased to 931 billion kWh which is double than of the level marked in the year making it one of the largest energy consumers in the world along with China, the USA and, Russia. In , India&#;s per capita electricity consumption was 900 kWh which was 1/3 of the average worldwide consumption [ 1 2 ]. Also, compared to , Indian per capita energy use has increased from .84 to .31 kWh in . India&#;s energy sources primarily depend on non-renewable coal-based sources which contribute to a massive amount of greenhouse gases [ 3 5 ].

Emerging third generations are gaining importance due to their low fabrication cost, and transparent and semitransparent makes them a potential candidate for aesthetic building integration. Organic photovoltaics uses organic polymer as the light-absorbing layer. Organic PVs are lightweight, and flexible which allows them to be applied in building as a BIPV system [ 36 38 ]. O&#;Regan and Gratzel carried out seminal work on dye-sensitized solar cells (DSSC) [ 39 ]. Since its inception, extensive research was carried out to improve the efficiency and stability of DSSC. DSSCs are considered for BIPV application due to its simpler and low-cost fabrication process, flexible, have potential to operate at diffuse solar radiation [ 40 41 ]. Colored and semi-transparent windows are popular for BIPV application [ 42 43 ]. However, factors inhibiting to its commercialization are long term- stability and durability. Table 1 listed the advantage and disadvantages of various PV technologies. Recently, Perovskite PV gained attention due to its efficiency improvement in 10 years. However, they are mostly operated and fabricated at inert atmospheric condition. Tunable transparency [ 44 ], and low temperature fabrication [ 45 ] makes it fascinating to researcher for BIPV application [ 46 47 ].

Thin films include (i) amorphous silicon (a-Si) (ii) Copper &#; Indium Selenide (CIS) or Copper-Indium-Gallium- Selenide (CIGS), (iii) Cadmium-Telluride (CdTe). The thickness of the film could be a few nanometers to micrometers. These technologies have meager efficiencies in comparison to c-Si, typically 11&#;12%. However, they have several advantages such as (a) less loss in performance under overcast cloudy climatic conditions and partial shading from obstacles [ 23 24 ] (b) employ lower semiconductor material and hence lower production cost (c) manufacture of transparent or translucent modules using laser scribing [ 25 27 ]. Amorphous silicon is the non-crystalline form of silicon, with atoms disoriented in a random network structure. The major advantage of it is being able to be deposited as thin films on to a moldable substrate like plastic at less than 300 °C of manufacturing temperature. Moreover, its absorptivity is higher (~40 times) and needs only 1% (about 1 μm) of material of crystalline silicon, which results in lower making cost/unit-area. Due to its flexible nature, it can be molded into any suitable complex shape for building integration. Although it has high efficiency in comparison to other thin-film technologies, it suffers from degradation due to hydrogenation (Staebler-Wronski effect) [ 28 33 ]. Cadmium telluride (CdTe) is a single-junction solar cell having 1.45 eV bandgap energy. It is a direct bandgap semiconductor nearly ideal for optimal conversion of solar radiation into electricity. An efficiency exceeding 20% has been reported CdTe PV. The major limitations of CdTe cells are its instability and toxicity of cadmium which makes it less suitable for PV application. Copper Indium Gallium Diselenide (CIS) is a polycrystalline compound consisting of copper, indium, gallium, sulphur and selenide elements, with the highest reported conversion efficiency of about 25% in combination with perovskites [ 34 ] CIS has high light absorptivity and 0.5 μm of CIS can absorb 90% of the solar spectrum [ 35 ]. Similar to other thin-film technology, CIGSs are semi-transparent and flexible.

Crystalline silicon (c-Si) PV cells are the most widely used and predominant technology in the market due to their mature and long-term durability. Monocrystalline PV cells are made from a single crystal, developed using the Czochralski process with the best-reported efficiency of nearly 22%. Polycrystalline solar cells are developed by melting several fragments of silicon together to form a wafer. Typical efficiency is in the range of 14&#;18% for polycrystalline PV cells, which is less efficient than the monocrystalline counterparts, since electrons have less freedom of movement due to grain boundaries of many crystals in each cell. However various anti-reflective coatings can be applied onto the surface to change the color of the PV cells. Presently colored silicon PV is also under investigation [ 13 14 ]. The major constraints of crystalline silicon PV cells are power losses due to the shading and at elevated temperature [ 15 22 ].

The performance degradation of both BIPV and BAPV is possible at higher ambient temperature and exposure to higher incident radiation, which increases the PV cell&#;s temperature. Crystalline silicon and thin-film both work, with poor efficiency, at higher PV cell temperature. Thermal regulation BAPV system is possible by employing forced water flow, forced airflow or phase change material (PCM) at the back of the system [ 116 117 ]. At the back of the BPAV system, copper pipes are integrated to flow the air [ 118 120 ] or water [ 121 122 ]. This typical BAPV is also known as BAPV-thermal (BAPV/T) water or air collector, where water or air will extract the additional heat energy from the PV system and allow PV system to operate efficiently. Hot air or water can be used by building purposes [ 123 ]. Notably, researchers often misuse the BIPV term [ 121 130 ]. As BIPV is attached as a building envelope, natural airflow and PCM are the only two available and investigated options to diminish the elevated PV cell temperature [ 131 133 ]. The inclusion of collector to BIPV was forced to compromise with buildings aesthetic. For a system which is BAPV/T system is most often referred to as BIPV/T in the articles. Hence, care should be taken when referring to a PV/T system as BAPV/T or BIPV/T. A typical BAPV/T with a water flow system is shown in Figure 5 . Details of BIPV and BAPV are listed in Table 2

A typical LSC consists of a glass or plastic-based square/rectangular-shaped waveguide luminophores, which absorbs a short-wavelength photon and convert them into long-wavelength. Further, due to total internal reflection, these photons finally reach the PV cells attached at the edge of the waveguide [ 106 110 ], as shown in Figure 4 . The advantage of LSC-BIPV system is that the PV cells are placed at the edge, which does not create an obstacle for viewing. Also, this waveguide plate can be made semi-transparent to fully-transparent or different colors, which is aesthetic for building application and suitable for building window integration [ 111 114 ]. Promising results, using LSC-thin film integration, was also reported by [ 115 ]. LSC does not possess any thermal effect on PV cells, which is an added advantage over low concentrating CPC.

Concentrator-based BIPV windows are also very attractive for less energy-hungry building integration. Low concentrating compound parabolic concentrator (CPC) [ 94 ] and luminescent solar concentrators (LSC) [ 95 ] are now dominating the major building-integrated concentrating photovoltaic research activity. Low concentrators are static which reduces the cost of the expensive solar tracker. The thermal effect is lower than a high concentrator, due to a low concentrator on PV cells, which reduces the necessity of a cooling system and makes a low concentrator a suitable candidate for building&#;s window and façade application [ 96 98 ]. For northern latitude location, diffuse solar radiations are higher, CPC and LSC both work efficiently. Concentrating PV came into a scenario to reduce the usage of the costly silicon material by replacing low-cost material, which concentrates a higher amount of incident solar light on a lesser PV material [ 99 ]. For crystalline silicon-CPC-based BIPV window, regular distribution of spacing between PV cells offer semi-transparency (silicon solar cells are opaque), as shown in Figure 3 . Different geometries of CPCs were investigated for BIPV window and façade application [ 100 103 ]. Recently, the performance of DSSC and perovskite solar cells was also investigated, using low concentrating CPC, which enhanced the PV performance than non-concentrating counterpart [ 104 105 ].

Want more information on solar roof tiles? Feel free to contact us.

Recommended article:
Battery OEM - Future of Power
How does tensile strength affect steel wire rope?
6 Questions to Ask an Inverter Manufacturer Before You Buy
Should I oversize my solar inverter?

BAPVs are an addition to the traditional or new PV system, on an existing or new building whereas BIPVs replace the existing traditional building envelope, such as window, roof, and wall [ 74 ]. Hence, BIPV has a greater impact on the building&#;s indoor environment. BIPVs are often transparent or semi-transparent by nature, which allows incident daylight and solar heat to pass through, thereby directly modifying the indoor ambiances. Additionally, it also has a variety of capabilities like control solar heat gain or loss, daylight glare and offset the window, roof or wall material cost [ 75 ]. On the other hand, BAPVs have no such contribution to the building environment other than the production of green power. Currently, available BIPV products include BIPV tile, foil and glazing [ 76 77 ]. BIPV foils and tiles are primarily applied on the roof while BIPV glazings are mostly employed for vertical semi-transparent and transparent windows, façade and wall applications. Presently, 80% of the BIPV market contributes to rooftop-mounted and only 20% of it is in accord for façade-mounted [ 2 82 ]. Generally, rooftops, standing without any hindrance from nearby tall buildings or trees, are the ideal solutions to harvest the best energy when pitched at certain elevation angles. BIPV foil products are best suited for building applications due to their flexibility and light-weight properties. PV cells for BIPV products are mostly thin films, which possess low power generation due to the high electrical resistance of the thin film. However, due to a low temperature coefficient of thin-film BIPV foil, power degradation is comparatively less at high temperatures to silicon types. Alwitra GmbH and Co, which uses amorphous silicon cells and Uni-Solar cells are the present manufacturers of BIPV foil. Next, BIPV tiles are most prominently used as roof integration, which includes covering the entire roof or selected part of the roof with BIPV tiles. Some of these tiles also appear to be similar to that of a ceramic curved tile, which might be aesthetically pleasing but are not effective in terms of power generation, due to its curved surface area [ 76 77 ]. SRS Energy, Solar Century, Luma solar, Suntegra and, Sunflare Tesla are few of the present BIPV tile manufacturers.

4. Potential of BIPV/BAPV in India

2 of landmass, and is the seventh largest country in the world. It is in the tropical region and receives maximum solar radiation in summer, and experiences about 300 sunny clear days in a year. Ambient conditions vary from 45 °C in summer while 4 °C in winter and has a hot-dry, warm-humid, composite, temperate, and cold climatic zones [2/Day of annual average direct normal irradiance in most of the Indian states and around 5.0&#;5.5 KWh/m2/Day average global horizontal irradiance [

India lies between 68°7&#; to 97°25&#; east longitude and 8°4&#; to 37°6&#; north latitude, has 2.9 million Kmof landmass, and is the seventh largest country in the world. It is in the tropical region and receives maximum solar radiation in summer, and experiences about 300 sunny clear days in a year. Ambient conditions vary from 45 °C in summer while 4 °C in winter and has a hot-dry, warm-humid, composite, temperate, and cold climatic zones [ 135 ]. India&#;s rich solar radiation profile shows 4.5&#;5.0 KWh/m/Day of annual average direct normal irradiance in most of the Indian states and around 5.0&#;5.5 KWh/m/Day average global horizontal irradiance [ 136 137 ]. This makes India one of the most potential candidates to contribute to PV power generation. Figure 6 shows the solar radiation intensity throughout India. India&#;s projected electricity demand in is expected to be TWh. India&#;s present energy demand is supplied by 70% of imported crude oil and coal. Indian thermal power plants, that are run by coal, are the most inefficient ones. Hence, in order to become an energy-secured country and dependent from oil-import, India should use its solar PV power potential. Although, India has a higher solar radiation, being a developing country, PV power generation faces issues, including high initial installation cost of PV power generation, the lack of suitable storage devices or unavailable during an instant power supply demand. Backup power supply from fossil fuel-generated kerosene oil lamps, diesel generators, etc. are still low cost in India [ 138 ]. However, this fossil fuel generated power emits considerable amount of green house gas ( GHG). India is committed to lowering its GHG to 30&#;33% by , compared to level.

$

k) to set up a 5 MW solar power plant at its Gurugram (28.45° N, 77.02° E) facility. The plant would help to lower CO2 emissions by 5,390 tonnes annually in 25 years. ReNew Power had commissioned 300 MW solar plant at Pavagada Solar Park in Tumkur district in Karnataka (13.37° N, 76.64° E). The solar power plant could reduce 0.6 million tonnes of CO2 emission per year. The plant uses high efficiency Mono PERC solar modules and is based on seasonal tilt technology with string invertors. However, solar power plants are practically is not feasible for urban areas where large amount of space is required. India&#;s population growth and rapid urbanization land availability for solar plants will be a complicated issue. Hence, solar rooftops should be given higher priority. Some of the major PV installations include Braboune stadium, Mumbai, which is the world&#;s largest solar rooftop with capacity of 820.8 kWp, as shown in 2, which offsets tons of CO2 as shown in

Interestingly, energy generation from PV devices was in discussion in India since . However, progress was limited until [ 140 141 ]. The first significant move was taken in to priorities the PV power generation through the National Action Plan on Climate Change, by launching the JNSSM scheme [ 142 ]. In , the total installed capacity from PV was only 39.6 MW. After Prime Minister Narendra Modi came into power, India&#;s target changed from 20 GW to 100 GW, which included grid-connected projects, off-grid projects, and solar parks. It was also fixed that out of 100 GW, rooftop PV should produce 40 GW by [ 143 ]. Under the JNSSM mission, grid-connected rooftops and small solar power plant programs have been launched to obtain the 40 GW rooftop power generation. The minimum and maximum limit of installing PV power capacity are to 1 kWp, and 500 kWp, respectively [ 139 144 ]. India has 29 states and 7 union territory out of which Madhya Pradesh, Gujarat Ladakh, Andhra Pradesh, Maharashtra, and Rajasthan receive the maximum amount of average annual solar radiation, as compared to other states of India. Gujarat is the first Indian state which implemented a solar policy in the year , well before the initiation of JNNSM. Rajasthan started its solar mission in to meet the national target. Karnataka started its solar mission for the period of to . Madhya-Pradesh started its solar policy in and provided the incentives and benefits to the Private Sector to encourage the PV installation [ 145 ]. To initiate the government target, several commercial investors came in front. Cleanmax solar had invested Rs 600 crores to set up a 150 MW solar farm in Sirsa District, Haryana (near to New Delhi, 29.05° N, 76.08° E) on a stretch of 600 acres of land. Bharathi Cement had commissioned a 10 MW solar power plant in the manufacturing facility, located at Kadapa in Andhra Pradesh (14.46° N, 78.82° E). The plant is expected to generate 1.6 crore units of electric power annually, and help to reduce Bharathi&#;s overall energy costs by reducing its dependence on thermal power. Maruti Suzuki India had planned to invest Rs 24 crore (k) to set up a 5 MW solar power plant at its Gurugram (28.45° N, 77.02° E) facility. The plant would help to lower COemissions by 5,390 tonnes annually in 25 years. ReNew Power had commissioned 300 MW solar plant at Pavagada Solar Park in Tumkur district in Karnataka (13.37° N, 76.64° E). The solar power plant could reduce 0.6 million tonnes of COemission per year. The plant uses high efficiency Mono PERC solar modules and is based on seasonal tilt technology with string invertors. However, solar power plants are practically is not feasible for urban areas where large amount of space is required. India&#;s population growth and rapid urbanization land availability for solar plants will be a complicated issue. Hence, solar rooftops should be given higher priority. Some of the major PV installations include Braboune stadium, Mumbai, which is the world&#;s largest solar rooftop with capacity of 820.8 kWp, as shown in Figure 7 a. Another major installation is carport at Cochin International Airport, which is India&#;s largest carport solarized by Tata Power Solar. The plant is 2.67 MW, and is spread across an area of .9 m, which offsets tons of COas shown in Figure 7 b.

Although, in India, 83.3 crore reside in a rural area out of 121 crores, urbanization is occuring at a rapid pace. Every minute, 30 Indians move from a rural area to a city, seeking better-paying jobs. Population and economic growth have fostered urbanization in the country and the number of urban towns and cities has drastically increased [ 146 147 ]. By the end of , 590 million Indians will be in city for which new buildings are required. It is expected that five-fold built space will be in than level in India, of which 60% will be air-conditioned space. Maintaining similar conditions, Indian&#;s building can consume energy and emits GHG with a 700% increment by , compared to levels [ 135 ]. Presently building consumes 30% of electricity in India [ 148 ]. The reduction of building energy enhances the demand for sustainable building, which will perform as low energy or less energy-hungry building by trim down the HVAC load demand. To attain such a building, envelopes need to be energy efficient and responsive to an outdoor conundrum. To assess the performance of the buildings, The Energy and Resource Institute of India (TERI) and MNRE has created Green Rating for Integrated Habitat Assessment (GRIHA), and the Leadership in Energy and Environmental Design (LEED) rating tools to help curtail the substantial resources consumed by the building industry, and to reduce the overall environmental impact within tolerable limits. GRIHA evaluates the ecological performance of the building comprehensively by controlling energy consumption, reducing carbon dioxide gas emissions and reinforce the use of inexhaustible and processable sources to the best possible extent [ 149 150 ]. MNRE also encourages now passive building which will use solar energy by the suitable orientation of building for daylighting, heating and cooling load demand [ 151 ].

2, which can be a huge potential of 124 GW for rooftop BAPV to satisfy 40 GW rooftop PV power generation target by . Rooftop PV installations grew at robust pace adding 1,836 MW in the financial year &#;, with a total becoming 10 GW. 2 area and annual energy generation cost is 14 lakh (

$

19k) Unit kWh, while the cost of installation was Rs 18 crore (

$

k). Coal India Limited&#;s Corporate Headquarters at Rajarhat in Kolkata (22.57° N, 88.37° E) installed 632 PV panels with total capacity of 140 kW. The solar energy powers the uninterrupted power supply for desktops, emergency lighting systems and the landscape lighting of CIL&#;s corporate office. Tata BP Solar has implemented 30 kWp (

$

250,000) BAPV system in Samudra Institute of Maritime Studies in Pune (18.52° N, 73.85° E). Moser Baer has installed a 1.8 kWp BIPV exterior façade of Jubilee shopping complex in Hyderabad (17.38° N, 78.48° E) to meet power requirements in shopping complexes. The government buildings in India are also encouraged to use solar energy in an aesthetic approach by using BIPV/BAPV technology. The government is also focused on increasing the roof top systems and streamlining policy implementation processes. In , Novus green installed a 1MW BAPV system ( PV system each had 250 Wp) at the rooftop of IIT Delhi. Energy Efficiency Services (EESL) had planned to invest INR 800 crore for rooftop solar in Maharashtra across state-owned buildings to install 200 MW grid-connected systems. EESL estimates that about 100 million units would be saved per year by replacing energy-inefficient ceiling fans (6 lakh), LED bulbs (11 lakh) and air-conditioners () along with streetlights (14,000) and retrofitting buildings.

BIPV and BAPV both can contribute a considerable amount of energy and improve the building&#;s indoor environment in India [ 152 153 ]. However, the dearth of BIPV experts and BIPV marketing professionals, limited in-house consumption data, dearth of ability in planning, commissioning, operation, and maintenance of solar PV/BIPV projects, inadequate training and capacity building, not enough available information about BIPV for policy-making and mobilizing civil society are the barrier for Indian BIPV/BAPV market [ 81 82 ]. Another major barrier for widespread PV in India is the lack of resources of raw materials for PV manufacturing. BIPV technology, which is mainly thin-film-based, did not have much uptake in India due to the same reason. For crystalline silicon, India depends on import of the silicon wafer. Currently, in India, the thin-film PV industries are run by US-based First Solar (22% share), Canadian Solar (6% share) and 6% share of Trina Solar Chinese manufacture (6%). India also cannot support CdTe production as India&#;s copper refining industry size is not big enough and upgradation is required to enhance tellurium recovery rates from the copper refining process [ 154 ]. The Indian developer, Vikram Solar, has a 3.5% share followed by Moser Baer, Tata Power Solar and Lanco [ 155 ]. China controls over 97% of rare earth material which makes them capable to control the price of thin-film [ 155 ]. Poor performance of thin-film PV system compared to silicon PV system creates a negative impact on thin-film BIPV system. Thin film degradation occurs in higher rate than crystalline PV over 25 years. Also, thin-film PV cells possess micro-cracks after few years of operation, due to the temperature gradient differences between bottom and top, which cause additional cost of replacement. In India, utilization of BIPV and BAPV is still not fully well established and primarily most of the major integration types are BAPV. Solar rooftop PV application which is BAPV technologies are predominant in India. According to census , in India, there are 331 million households, with urban settlement area of 77,370 km, which can be a huge potential of 124 GW for rooftop BAPV to satisfy 40 GW rooftop PV power generation target by . Rooftop PV installations grew at robust pace adding 1,836 MW in the financial year &#;, with a total becoming 10 GW. Figure 8 a shows the spaced type semitransparent crystalline solar BIPV module integrated on the rooftop having installed capacity of 1.68 kWp. Each module had dimensions of mm × 0.987 mm × 40 mm covered with 36 c-Si panels with a transparent area of 49% and rated power of 150 W. Figure 8 b shows the India&#;s first zero energy building, which was constructed in . PV panels occupy marea and annual energy generation cost is 14 lakh (19k) Unit kWh, while the cost of installation was Rs 18 crore (k). Coal India Limited&#;s Corporate Headquarters at Rajarhat in Kolkata (22.57° N, 88.37° E) installed 632 PV panels with total capacity of 140 kW. The solar energy powers the uninterrupted power supply for desktops, emergency lighting systems and the landscape lighting of CIL&#;s corporate office. Tata BP Solar has implemented 30 kWp (250,000) BAPV system in Samudra Institute of Maritime Studies in Pune (18.52° N, 73.85° E). Moser Baer has installed a 1.8 kWp BIPV exterior façade of Jubilee shopping complex in Hyderabad (17.38° N, 78.48° E) to meet power requirements in shopping complexes. The government buildings in India are also encouraged to use solar energy in an aesthetic approach by using BIPV/BAPV technology. The government is also focused on increasing the roof top systems and streamlining policy implementation processes. In , Novus green installed a 1MW BAPV system ( PV system each had 250 Wp) at the rooftop of IIT Delhi. Energy Efficiency Services (EESL) had planned to invest INR 800 crore for rooftop solar in Maharashtra across state-owned buildings to install 200 MW grid-connected systems. EESL estimates that about 100 million units would be saved per year by replacing energy-inefficient ceiling fans (6 lakh), LED bulbs (11 lakh) and air-conditioners () along with streetlights (14,000) and retrofitting buildings.

Another barrier in India for poor BIPV/BAPV - standalone system is the unorganized Indian electricity market. The PV power generation sector includes three different customers. The first customer state distribution companies (DISCOMs) who have renewable purchase obligations (RPO) to buy PV power and meet 10.5% PV electricity generated, second is the rooftop PV consumers (RPVCs) and third is large buyers of power who are also known as open access consumers (OACs) [ 156 ]. Under open access (OA), consumers are capable of buying electricity from producers who generate electricity independently. Indian rail started exploring PV power from OA. Developers feel that RPO is not same for all state as State Electricity Regulatory Commissions (SERCs) has different benchmark for each state. PV power electricity price varies from INR 7.5 to INR18.5/kWh. In , Central Electricity Regularity Commission (CERC) has implemented the PV/BIPV feed-in tariff of INR 17.9/kWh [ 157 ]. In India, the coal power electricity price is about INR 5.5/kW h, while the PV power price is about INR6.5/kW h. Hence, project developers are compelled to offer discounts [ 158 ]. Thus, DISCOMs are failing to comply with RPO requirements, due to their poor financial health and lower solar tariff support. Hence, they prefer to wait for buying low price PV electricity. DISCOMs also argued that BIPV/BAPV based standalone systems increase their financial burden as RPV customers prefer to buy grid electricity over BIPV/BAPV power due to intermittency. Intermittent PV power generation is also an issue for the promotion of OA [ 159 ]. To rectify this issue, energy banking can be created where DISCOM will facilitate OA transactions through electricity banking, between an independent power producer and OAC. DISCOM can generate less power whenever an independent power producer generates a higher amount of power than the OAC&#;s demand, in order to use surplus PV power and generate when PV generation is reduced and shortfalls arise [ 159 160 ]. The presence of multiple electricity regulatory boards like MNRE (Ministry of New and Renewable Energy), CERC (Central Electricity Regulatory Commission), SERC (Ministry of Power and State Electricity Regulatory Commission) also make the legal process a cumbersome task [ 161 ].

164,

By the end of Sep , India&#;s cumulative installed solar capacity stood at 33.8 GW, of which 88% are PV plants and 12% rooftop installations. Ambiguity in incentive implementation, non-availability of storage systems incentives, lack of consumer awareness and research studies are the reason behind this sluggish movement for rooftop PV application in India [ 162 ]. Dust accumulation, which reduces PV power generation, should also be taken care of as air quality in India can pose a negative impact [ 163 165 ].

If you are looking for more details, kindly visit China solar tile company.

Comments

0

0/2000